First phase of Kazakhstan’s massive Karachaganak oil field expansion finishes

Published November 18, 2026 17:54

Svyatoslav Antonov

Svyatoslav Antonov

Senior Journalist of the Business News department s.antonov@kursiv.media
Yerlan Iskakov

Yerlan Iskakov

Senior Journalist ye.iskakov@kursiv.media
Photo: kmg.kz, photo editor: Milosh Muratovskiy

The first phase of the Karachaganak expansion project (KEP) has reached a key milestone, with the sixth gas reinjection compressor brought online, according to the West Kazakhstan region akimat (regional administration).

Sixth compressor boosts gas reinjection capacity

Karachaganak Petroleum Operating B.V. (KPO), the field operator, announced that the KEP-1B project had achieved its first gas reinjection milestone. The sixth compressor is designed to increase the volume of gas injected back into the reservoir, helping maintain pressure and extend the field’s production plateau.

Gas reinjection is essential to sustaining oil and condensate production. Associated gas produced alongside oil is compressed and pumped back into the reservoir to maintain pressure, helping hydrocarbons flow toward production wells and supporting long-term output.

Read also: KazMunayGas aims for major cost cuts at Karachaganak oil field.

Photo: Karachaganak Petroleum Operating B.V., photo editor: Dastan Shanay

The fifth gas reinjection compressor was commissioned in 2024 as part of the KEP-1A project. The sixth compressor’s commissioning brings the first phase of the Karachaganak expansion project to a close.

The new facilities are expected to improve the reliability of operations at the Karachaganak processing plant and help sustain production at the field.

Karachaganak gas processing plant planned

There is no official announcement yet on a subsequent expansion phase, KEP-2. Another major development planned for the field is a gas processing plant with an annual capacity of approximately 5 billion cubic meters.

The plant is expected to increase domestic gas processing capacity and supply additional volumes of marketable gas to Kazakhstan’s domestic market.

Read also: Kazakhstan’s oil elite: The 10 largest companies of 2025.

Топ-10 нефтяных компаний Казахстана по итогам 2025 года
Photo: Shutterstock, photo editor: Adelina Mamedova

Who operates the Karachaganak field?

KPO is responsible for developing the Karachaganak oil, gas and condensate field. Its shareholders are Eni (29.25%), Shell (29.25%), Chevron (18%), Lukoil (13.5%) and KazMunayGas (10%).

KazMunayGas’ wholly owned subsidiary, KMG Karachaganak, manages the national oil and gas company’s 10% participating interest in the project.

Read also